Brent tracks the curve only if Gulf producers keep output 3.0 /d below targets
What do Gulf producers, strategic refills and shipping costs do to Brent through 2029?
In brief
What the default says: US returns over two years, base restocking elsewhere, producers trimming as stocks rise, the curve's de-escalation and demand fitted to 2026- Brent tracks the futures when the Gulf core trims output 3.0 mb/d below its targets in 2028.→ Exhibit 2
- If the Gulf core produces at its targets, 2028 Brent averages $58, against $76 on the curve.→ Exhibit 2
- Restocking 413 mb of strategic stocks outside the US adds $0.77 to 2028 while producers trim output.→ Exhibit 5
- Commercial stocks regain their long-run level by May 2028; strategic stocks stay short until Jul 2029.→ Exhibit 6
- Shipping adds $9.65 a Gulf barrel in November 2026; 50% reaches Brent, the rest comes off Gulf netbacks.→ Exhibit 14
| What would change this view | Trigger | Today | Decided by |
|---|---|---|---|
| The Gulf core returns to its targets | Saudi, Iraqi and Kuwaiti output above 17.0 /d for three months in 2027 | 9.2 mb/d restricted in the model's November 2026; targets 17.6 mb/d (OPEC, 4 Oct 2026)pending | OPEC secondary sources, monthly, from February 2027 |
| China restocks while Brent sits above its 12-month average | Chinese onshore crude stocks up more than 30 mb in a month with Brent above that average | 1.192 bn bbl on 19 Oct 2026; October's Brent $108.34 against a 12-month average of $86.12pending | Energy Aspects and Kpler estimates, monthly |
| Global stocks stay short into mid-2027 | Global observed stocks still more than 300 mb below end-February 2026 in mid-2027 | 509 mb below at end-September 2026 (IEA, October report)pending | IEA Oil Market Report, July 2027 |
The reasoning behind each point
- producersBrent tracks the futures when the Gulf core trims output 3.0 mb/d below its targets in 2028.
Refitted to the futures, trimming as stocks rise misses them by at most 2.0% on average in any restocking setting. Producing at targets or ramping to capacity misses them by at least 9.1%.
- holdIf the Gulf core produces at its targets, 2028 Brent averages $58, against $76 on the curve.
Everything else stays at the default setting and keeps its fit. Prices then sit below the long-run level of $69.93, the December 2030 contract.
- refillsRestocking 413 mb of strategic stocks outside the US adds $0.77 to 2028 while producers trim output.
The Gulf core supplies 66% of those barrels by raising output, so the price moves little. China buys faster when Brent sits below its 12-month average, which October's did not.
- stocksCommercial stocks regain their long-run level by May 2028; strategic stocks stay short until Jul 2029.
Once commercial stocks are back, the curve's level is read as premium: about $9 of the 2027 average. If that premium fades faster, the curve needs tighter stocks.
- shippingShipping adds $9.65 a Gulf barrel in November 2026; 50% reaches Brent, the rest comes off Gulf netbacks.
War-risk insurance and excess freight both fall with tension. If 30% of the excess stays, Brent barely moves and Gulf producers bear the cost.
Next: Range and scenarios — the oil axis these paths would mark
Brent tracks the curve only if Gulf producers keep output below targets
Who sets Brent once the Strait reopens?Exhibit 1 · Monthly Brent by setting against futures and the Brent price simulation
About this exhibit
Exhibit 2 · Average Brent by Gulf producer rule and restocking setting
| Gulf core | None | Slow | Base | Fast |
|---|---|---|---|---|
| Trim as stocks rise | $74.89 | $75.34 | $75.66 | $75.45 |
| Produce at targets | $54.51 | $55.79 | $58.08 | $59.45 |
| Ramp to capacity | $54.43 | $55.60 | $57.67 | $59.13 |
About this exhibit
Exhibit 3 · Gulf core and UAE crude output by producer rule, against targets
About this exhibit
Refills elsewhere change who sells the barrels more than their price
How much do strategic refills lift Brent?Exhibit 4 · Strategic refills and releases by holder, monthly
About this exhibit
Exhibit 5 · Brent less the futures curve by restocking setting, monthly
About this exhibit
Commercial stocks recover long before strategic stocks do
Where does the stock gap sit, and what is left in the price?Exhibit 6 · Commercial and strategic stock gap by holder, monthly
About this exhibit
Exhibit 7 · Brent split into stock-driven price, premium and shipping cost
About this exhibit
The Gulf core's rule moves Brent most
Which drivers move average Brent most, one at a time?Exhibit 8 · Change in average Brent from the default, one driver at a time
About this exhibit
The fit to the curve and the tables behind each section
How the curve is fitted, what each US schedule and China's rule do, what shipping costs, and how the site's oil models compare
Exhibit 9 · Fit to the futures curve by producer rule and restocking setting
| Gulf core | Restocking | Premium, $ | Half-life, months | Response to stocks | Average miss, % | Largest, % | 2027, % | 2028, % | 2029, % |
|---|---|---|---|---|---|---|---|---|---|
| Trim as stocks rise | None | 14.4 | 13.5 | 0.030 | 0.94 | 1.8 | 0.1 | 0.0 | −0.7 |
| Trim as stocks rise | Slow | 14.3 | 12.8 | 0.014 | 0.96 | 1.8 | 0.1 | 0.0 | −0.8 |
| Trim as stocks rise | Base | 14.3 | 11.6 | 0.001 | 0.92 | 1.8 | 0.2 | −0.3 | −1.3 |
| Trim as stocks rise | Fast | 13.1 | 9.2 | 0.000 | 2.01 | 3.1 | 0.7 | −2.6 | −2.4 |
| Produce at targets | None | 14.4 | 30 (bound) | – | 11.06 | 29.4 | 6.3 | −4.2 | −25.1 |
| Produce at targets | Slow | 2.9 | 30 (bound) | – | 9.12 | 26.4 | 1.0 | −0.1 | −16.8 |
| Produce at targets | Base | 15.8 | 27.8 | – | 11.82 | 29.3 | 8.6 | −0.9 | −24.5 |
| Produce at targets | Fast | 19.8 | 19.6 | – | 15.47 | 32.1 | 12.3 | −9.9 | −26.9 |
| Ramp to capacity | None | 14.4 | 30 (bound) | – | 11.06 | 29.4 | 6.3 | −4.2 | −25.1 |
| Ramp to capacity | Slow | 15.5 | 30 (bound) | – | 11.14 | 28.5 | 7.6 | −1.9 | −23.7 |
| Ramp to capacity | Base | 15.8 | 27.8 | – | 11.82 | 29.3 | 8.6 | −0.9 | −24.5 |
| Ramp to capacity | Fast | 19.8 | 19.6 | – | 15.47 | 32.1 | 12.3 | −9.9 | −26.9 |
About this exhibit
Exhibit 10 · Strategic refills outside the US the curve would need, by rule
| Gulf core | Times the base restocking | Refills outside the US, 2027, mb/d | 2028, mb/d | Barrels by December 2028, mb | Average miss, % |
|---|---|---|---|---|---|
| Trim as stocks rise | 0.00 | 0.00 | 0.00 | 0 | 1.63 |
| Produce at targets | 6 (bound) | 2.69 | 2.52 | 1,930 | 8.13 |
| Ramp to capacity | 0.00 | 0.00 | 0.00 | 0 | 11.06 |
About this exhibit
Exhibit 11 · Average Brent by US reserve return schedule, against no returns
| Schedule | Returned, mb | 2027 | 2028 | 2029 | Change, 2027 | Change, 2028 | Change, 2029 |
|---|---|---|---|---|---|---|---|
| No returnsNo US returns: a counterfactual | 0 | $83.55 | $75.17 | $71.59 | – | – | – |
| As fast as the sites allowFrom January 2027 at the sites' top fill rate, 0.672 mb/d, until the 203 mb are back (Nov 2027) | 203 | $85.04 | $74.24 | $70.96 | +$1.50 | −$0.93 | −$0.63 |
| Over one yearDOE's schedule over 52 weeks from a day in the first half of 2027, slowed by a fill rate of 0.25–0.67 mb/d | 203 | $84.21 | $75.56 | $71.75 | +$0.66 | +$0.39 | +$0.16 |
| Over two yearsOver 104 weeks from a day in the first half of 2027: the drawdown simulation's default | 203 | $83.96 | $75.66 | $71.74 | +$0.41 | +$0.49 | +$0.15 |
| Deferred six monthsOver 104 weeks, every first return 26 weeks later; 203 mb back by December 2029 | 203 | $83.67 | $75.60 | $71.86 | +$0.13 | +$0.43 | +$0.27 |
| Cheapest monthsThe 203 mb bought in the cheapest months from Jan 2027 to Jun 2029, at most 0.672 mb/d | 203 | $83.55 | $75.54 | $71.90 | $0.00 | +$0.37 | +$0.31 |
About this exhibit
Exhibit 12 · The multiplier on China's refill pace by month
About this exhibit
Exhibit 13 · Strategic refill demand by quarter, against Kpler's estimate
| Quarter | The default setting | Kpler |
|---|---|---|
| Q4 2026 | 73 | 506 |
| Q1 2027 | 294 | – |
| Q2 2027 | 720 | – |
| Q3 2027 | 815 | 664 |
| Q4 2027 | 805 | – |
By restocking setting outside the US, thousand barrels a day
| Restocking | Q4 2026 | Q3 2027 | 2028 average |
|---|---|---|---|
| None | 0 | 281 | 279 |
| Slow | 37 | 426 | 545 |
| Base | 73 | 815 | 702 |
| Fast | 200 | 1,688 | 373 |
About this exhibit
Exhibit 14 · Excess shipping cost per Gulf barrel and the part in Brent
About this exhibit
Exhibit 15 · Average Brent across the site's oil models, the futures and the EIA
| Figure | 2027 average | How it is made |
|---|---|---|
| Producers and refills, the default setting | $83.96 | one path, fitted to the futures closes; producers trim as stocks rise |
| Brent price simulation, median | $73.27 | the middle of its simulated paths on market odds for the reopening (Survey timing · 2026-calibrated demand · no strike risk after December) |
| Brent price simulation, mean | $73.95 | the average of the same paths |
| Futures strip | $83.75 | the twelve quoted contracts read two months ahead, 13 Nov 2026 |
| Brent price simulation's futures strip | $83.75 | front-month equivalent, Jan-27 to Feb-28 contracts, 13 Nov 2026 |
| EIA's November path, futures basis | $84.11 | the EIA's spot path moved onto the futures basis, as the Brent price simulation publishes it |
About this exhibit
Appendix
How one path is made, where each input comes from, and the checks the run passes95 checks, all pass
Brent, month by month from November 2026 to December 2029, from a model of oil stocks and prices. Commercial stocks clear the price; Saudi Arabia, Iraq and Kuwait trim output as stocks rise, produce at their OPEC+ targets or ramp to capacity; the US reserve is repaid on one of six schedules, on the reserve drawdown simulation's inputs, while other IEA members and China refill what they drew; and the Gulf's tension fades at the pace the futures imply, carrying a premium and a shipping cost. The premium, its half-life and the producers' response are fitted to the futures; demand responds as the Brent price simulation found in 2026 by default; every other input is a published figure or a named setting. One path per setting and no odds: model-conditional, not a forecast.
One path, month by month
| Symbol | Meaning | From | Assumed or estimated |
|---|---|---|---|
| commercial stocks against their long-run level, mb; the price clears it | the ledger: IEA, S&P Global | – | |
| Gulf core output (Saudi Arabia, Iraq, Kuwait), the UAE, the other Gulf producers | OPEC; the note's settings | – | |
| strategic refills by the US, other IEA members and China; releases still due | the reserve drawdown simulation (DOE); IEA; Energy Aspects | – | |
| the long-run level ($69.93, the December 2030 contract) and the stock slope (0.04 a day of cover) | Yahoo Finance; Goldman Sachs | – | |
| the premium at full tension ($14.31, fitted) and tension, fading at a fitted half-life | fitted to the futures | – | |
| the share of the shipping cost in Brent (0.50) and the cost: war-risk insurance plus excess freight | Reuters; Breakwave; the note's settings | – | |
| the price elasticities of consumption and of supply outside the Gulf | the 2026 replay (the Brent price simulation); the literature | – | |
| contango storage, filled while a month's spread exceeds full carry | the note's settings | – |
Model-conditional: what these inputs imply, setting by setting; not a forecast.
Exhibit 16 · Each input and where it comes from
| Input | In the model | Kind | Source |
|---|---|---|---|
| Brent front month (BZ=F) daily closes: the monthly averages from November 2025 to October 2026 China's rule reads, and February 2026's for the pre-war overhang | October 2026 average $108.34; 12-month average to October $86.12; February 2026 $69.41 | Yahoo Finance | Yahoo Finance, BZ=F daily closes — completed sessions, 13 Nov 2026 |
| Brent delivery-month contracts, January 2027 to February 2028, December 2028 and December 2029: closes of the last completed session, read two months ahead (the January 2027 contract prices November 2026) | BZF27.NYM $95.84 (November 2026) to BZZ29.NYM $71.89; the long-run level BZZ30.NYM $69.93; 2027 $83.75, 2028 $75.84, 2029 $72.71 between quoted contracts | Yahoo Finance | Yahoo Finance, Brent delivery-month contracts (NYMEX BZ) — BZF27.NYM, BZG27.NYM, BZH27.NYM, BZJ27.NYM, BZK27.NYM, BZM27.NYM, BZN27.NYM, BZQ27.NYM, BZU27.NYM, BZV27.NYM, BZX27.NYM, BZZ27.NYM, BZF28.NYM, BZG28.NYM, BZH28.NYM, BZM28.NYM, BZZ28.NYM, BZM29.NYM, BZZ29.NYM, BZZ30.NYM, 13 Nov 2026 |
| The Brent price simulation's default setting: monthly median, 2027 median and mean, and the EIA's path on the futures basis, from that page's first month to December 2027, matched by month (D-2026-11-05-BP7) | 2027 median $73.27, mean $73.95; EIA path's 2027 average $84.11 on the futures basis | This site | The Brent price simulation (Survey timing · 2026-calibrated demand · no strike risk after December) — the default setting's median, mean and the EIA path, 17 Nov 2026 |
| Gulf core OPEC+ required production for November 2026: Saudi Arabia 10.478, Iraq 4.431, Kuwait 2.676 mb/d; 17.6 in the model | 17.6 mb/d | Published | OPEC, press release of the seven countries' meeting of 4 October 2026 — November 2026 required production, the table, 4 Oct 2026 |
| Gulf core output: 9.2 mb/d restricted today, 19.7 at capacity with the Strait open; the trim rule keeps at least 12.0 and moves at most 0.5 a month; the share rule ramps 0.4 a month | 9.2–19.7 mb/d | The note's setting | research note: the oil-balance simulator with global restocking (1 Nov 2026) — §2 the producers' rules, 1 Nov 2026 |
| UAE output outside the quotas: 2.4 mb/d through Fujairah, 1.5 more from July 2027 on a second line; capacity 4.85, 5.0 from January 2027; ramp 0.15 a month | 2.4 mb/d, 3.9 from July 2027; capacity 5.0 | The note's setting on Kpler's second Fujairah line | Kpler — the UAE's second pipeline to Fujairah, mid-2027, 10 Jul 2026read in research note: the oil-balance simulator with global restocking (1 Nov 2026) §2 |
| Other Gulf output (Iran, Qatar, Bahrain, Oman): 6.0 mb/d pre-war, 2.0 lost at full tension; half of the Gulf core's open-strait output passes Hormuz in November 2026 | 6.0 mb/d less 2.0 at full tension | The note's setting | research note: the oil-balance simulator with global restocking (1 Nov 2026) — §2 the Gulf, 1 Nov 2026 |
| World consumption at the futures price: 102.8 mb/d in November 2026, 103.3 to 106.6 through 2027, then 0.8 and 0.7 mb/d a year in 2028 and 2029 | Nov 2026 102.8; Dec 2026 103.2; Jan 2027 103.3; Dec 2027 106.6; Jan 2028 106.8; Dec 2028 107.6; Jan 2029 107.8; Dec 2029 108.5 | IEA to 2027; growth after 2027 the note's setting | IEA, Oil Market Report, August and October 2026 — fourth-quarter 2026 demand 2.5 mb/d below a year earlier (October); 2027 demand up 2.4 mb/d to about 105.7 (August), 14 Oct 2026read in research note: the oil-balance simulator with global restocking (1 Nov 2026) §1 |
| Supply outside the Gulf at the futures price: 80.4 mb/d in November 2026, up 2.2 mb/d through 2027, then 1.0 and 0.5 mb/d a year | Nov 2026 80.4; Dec 2026 80.5; Dec 2027 82.7; Dec 2028 83.7; Dec 2029 84.2 | IEA to 2027; growth after 2027 the note's setting | IEA, Oil Market Report, July and October 2026 — non-OPEC+ supply up 2.2 mb/d in 2027 (July); world supply 100.7 mb/d in 2026 (October), 14 Oct 2026read in research note: the oil-balance simulator with global restocking (1 Nov 2026) §1 |
| Short-run price elasticities in the literature: consumption −0.05, −0.10 or −0.20 on a six-month average of price (the prototype's three; the page sets −0.10 and −0.20 beside the 2026 replay); supply outside the Gulf 0.10 on a nine-month average | demand −0.05 / −0.10 / −0.20; supply 0.10 | Literature range | research note: oil demand and supply elasticities (18 Oct 2026) — rows 1–3 and 6–8 (Hamilton 2009 survey −0.06; Baumeister–Hamilton 2019 −0.35 and 0.15; Caldara–Cavallo–Iacoviello 2019 about 0.08), 18 Oct 2026 |
| The demand setting fitted to 2026: the Brent price simulation's calibrated elasticity (the literature centre times the scale its 2026 replay fitted) at 1 month, 1 quarter and 12 months; this page's replay setting gives the same response at 12 months | −0.0496 on a 6-month average of price: the simulation's 0.012 / 0.024 / 0.044 at 1, 3 and 12 months, matched at 12; this page's 0.008 / 0.021 / 0.044 | This site | The Brent price simulation, its calibrated demand response — the literature centre × the 2026 replay's scale, 17 Nov 2026 |
| Brent's response to stocks: 4% for each day of world demand that stocks sit away from their long-run level; a floor of $45 and a steeper fall beyond 450 mb above it | κ = 0.04; floor $45 | Published (the slope); the floor and the overhang the note's setting | Goldman Sachs, via Reuters — Brent to average $56 in 2026 on an ~800 mb rise in global stocks from late 2025 to late 2026, from a fair value in the mid-$70s, 26 Aug 2025read in research note: the oil-balance simulator with global restocking (1 Nov 2026) §2: ln(56/75) over 800/105 days ≈ −0.038 |
| Commercial stocks against their long-run level at end-October: 509 mb drawn from global stocks by end-September, 40 mb more in October, 331 mb of it from strategic and obligated stocks (refilled explicitly), plus the pre-war overhang at February 2026's Brent | −509 − 40 + 331 + 20 = −198 mb (February 2026's $69.41 against the long-run $69.93) | Published (IEA, S&P Global); October's draw the note's setting | IEA, Oil Market Report, October 2026; S&P Global Commodity Insights — global observed stocks 509 mb below end-February at end-September (IEA); 331 mb released, 240 mb state and 91 mb obligated industry (S&P Global, 15 Oct), 15 Oct 2026read in research note: the oil-balance simulator with global restocking (1 Nov 2026) §2 |
| The IEA's collective action of 11 March 2026: 426 mb pledged, 172.2 mb by the US; 254 mb by other members to refill; 96 mb still to deliver, 40 mb by the US in November–December and 56 mb by others to February 2027 | 426 mb pledged; 96 mb to deliver | Published | IEA collective action of 11 March 2026; IEA statements of 7 and 15 October 2026 — pledges by member; about 96 mb outstanding, 15 Oct 2026read in research note: the oil-balance simulator with global restocking (1 Nov 2026) §1 |
| The US reserve's flows other than a new sale, from the reserve drawdown simulation: the September award and the 16 October offer still to deliver, the October and next season's weather exchanges, the owed pool (the barrels lent in 2026 and the new loans, with their premium), the first-return window, a fill rate between EIA's best week since 2023 and the sites' combined top rate, and the one- and two-year schedules (the values in the next column are copied) | 203.3 mb owed on average: (133 + the new loans) × 1 + 18–28%; first returns 1 Jan 2027 to 30 Jun 2027; fill 0.252–0.672 mb/d; 52 or 104 weeks; 30.3 mb still to deliver from November | This site | The reserve drawdown simulation (Reserve drawdown simulation) — its inputs for the returns and the deliveries still due, averaged over its draws, 17 Nov 2026 |
| China's onshore crude stocks 1.192 bn bbl on 19 October, 162 mb below the 4 May record; its buying rises by one pace for each $20 Brent sits below its 12-month average, at most 1.5 times; 104 mb of new storage in the fast setting | 162 mb to refill; 104 mb of new storage | Published (the stocks and storage); the buying rule the note's setting on Société Générale's reading | Energy Aspects, via Reuters (The Star); Kpler, via Hellenic Shipping News — 1.192 bn bbl on 19 Oct, 162 mb below the 4 May record of 1.354 bn; about 80 mb of new state storage and 24 mb of other capacity starting in 2026, 22 Oct 2026read in research note: the oil-balance simulator with global restocking (1 Nov 2026) §1 |
| Kpler's estimate of refill demand: about 506 kb/d of crude in the fourth quarter of 2026, up to 664 kb/d by the third quarter of 2027 (a comparison, not an input) | 506 kb/d (4Q26), 664 kb/d (3Q27) | Published | Kpler, via Reuters — strategic refills add about 506 kb/d of crude demand in 4Q26 and up to 664 kb/d by 3Q27, 9 Jul 2026 |
| Tension falls from 1 in October 2026 at a half-life fitted to the curve, to a floor of 0.05; fast halves the half-life, slow doubles it from February 2027; a relapse returns to full tension from July to September 2027 | floor 0.05; half-life fitted | The note's setting; the half-life is fitted | research note: the oil-balance simulator with global restocking (1 Nov 2026) — §2 tension and the premium, 1 Nov 2026 |
| Shipping: war-risk insurance at 8% of a $120m hull per 2 mb cargo against 0.25% pre-war, plus $5 a barrel of excess freight, both falling with tension; half reaches Brent | $9.65 a barrel in November 2026; 50% in Brent | Published (the insurance rates); hull, freight and pass-through the note's settings | Reuters, via OilPrice; Breakwave Advisors; Insurance Business — Hormuz war-risk 6–9% of hull value per transit (25 Sep); 7.5–12.5% (8 Sep); about 0.25% pre-war (28 Jun), 25 Sept 2026read in research note: the Middle East and Russia–Ukraine baseline (14 Oct 2026) §5b |
| Contango storage at full carry: $0.60 a barrel a month onshore plus 3.9% a year financing | $0.60 a barrel a month; 3.9% a year | The note's setting | research note: the oil refill and producer simulator (31 Oct 2026) — contango storage at full carry, 31 Oct 2026 |
About this exhibit
Exhibit 17 · The model, its fit and the reference run
Model-conditional: every path on this page follows from the equations and inputs below, one path per setting; none is a forecast and none carries odds.
- path
Each path runs month by month from Nov 2026 to Dec 2029. Commercial stocks move with supply less demand less strategic refills plus releases still due, and Brent clears them: it sits above its long-run level of $69.93 when stocks are short, plus a premium that fades with tension and the part of the shipping cost that reaches it.
- fit
The default fits three numbers to the 19 quoted contracts of 13 Nov 2026: the premium at full tension ($14.31), its half-life (11.6 months) and how hard the Gulf core trims as stocks rise (0.001); its average miss is 0.92%. The stock slope and the starting gap are fixed at outside anchors, because the curve cannot tell them from the premium.
- settings
864 settings: six US return schedules, three producer rules, four de-escalation paths, three demand responses and four restocking settings outside the US. Each demand response is refitted; every other setting keeps its fit.
- changed
From the author's decision of 5 Nov 2026 (D-2026-11-05-OB9), the four further contracts are read. The long-run level is the December 2030 contract, $69.93, where before it was the December 2029 contract, $71.89, on the same closes of 13 Nov 2026. The starting stock gap moves with it, to −198 mb from −126 mb, because February 2026's Brent is read against the new level. The fit reads 19 quoted contracts where before it read 16, adding the March 2028 contract, the June 2028 contract, the June 2029 contract.
The fit at each demand response (producers trim, base restocking, even US returns)
| Demand response | Premium, $ | Half-life, months | Response to stocks | Average miss, % |
|---|---|---|---|---|
| 2026 replay, −0.050 | 14.31 | 11.6 | 0.001 | 0.92 |
| −0.10 | 14.43 | 11.5 | 0.006 | 0.92 |
| −0.20 | 14.89 | 11.0 | 0.002 | 0.84 |
The starting commercial gap, each refitted
| Gap, mb | Premium, $ | Gulf core 2028, mb/d | Brent 2028 | At targets, 2028 | Fast restocking less none, 2028 |
|---|---|---|---|---|---|
| −300 | 11.7 | 14.50 | $75.93 | $56.54 | +$0.45 |
| −150 | 16.4 | 14.58 | $75.30 | $57.96 | −$0.42 |
| −198(default) | 14.3 | 14.60 | $75.66 | $58.08 | +$0.56 |
The engine on the research run's own inputs (research note: the oil-balance simulator with global restocking (1 Nov 2026)): 38 months of the curve and a long-run level of $71.06
| Figure | Research run | Engine |
|---|---|---|
| Premium at full tension, $ | 32.6555 | 32.6555 |
| Half-life, months | 11.4772 | 11.4772 |
| Response to stocks | 0.11285 | 0.11285 |
| Average miss, % | 0.8885 | 0.8885 |
| Largest path difference over 5 settings | – | under one millionth |
About this exhibit
How the numbers are made
brent_front + brent_contracts ──▶ the front month's monthly averages from November 2025 to October 2026 and February 2026's; the futures on the front-month basis — for each simulated month the contract two months out — at the sixteen months quoted, joined log-linearly between them; the December 2029 contract as the long-run level ──▶ the curve gulf_core_targets + gulf_core_range + uae + other_gulf + demand_base + supply_base + elasticities + stock_price + tension + shipping + storage ──▶ the market's settings as cited: Gulf output by rule, the baseline consumption and supply outside the Gulf, the price's response to stocks, tension, the shipping wedge and storage at full carry ──▶ the market spr_sim + brent_demand ──▶ the reserve drawdown simulation's US flows copied and averaged exactly over its draws, week by week to December 2029, then by month; checked against its engine's own paths; the replay demand setting from the Brent price simulation's 12-month elasticity ──▶ the US flows and the demand setting x0_ledger + collective_action + china + the US flows and the demand setting + the curve ──▶ the strategic ledger: releases still due as supply, the US return schedules, other members' and China's restockings as demand; commercial stocks at end-October from the IEA's draw, the barrels released and the pre-war overhang at the long-run level ──▶ the ledger the curve + the market + the ledger ──▶ themes._oil_det: the premium, its half-life and the producers' response fitted to the quoted contracts at each demand response; one path for each of 864 settings with storage at full carry; the fit by producer rule and restocking setting, the restocking the curve would need, the starting gap's robustness and the drivers one at a time ──▶ the paths the paths + kpler_refill + brent_sim ──▶ each setting's yearly averages, output, refills, stocks and price split; the refills against Kpler's estimate and the paths against the Brent price simulation; the port checked against the prototype's run on its own inputs; the reproduction checks (validate, check, publish) ──▶ the data the page reads
Sources
- licensedYahoo Finance: Brent crude futures (BZ=F) daily closes and the delivery-month contracts January 2027 to February 2028, December 2028 and December 2029, completed sessions to 13 Nov 2026
Source: Yahoo Finance · https://finance.yahoo.com/quote/BZ%3DF/
- computed hereThe Brent price simulation on this site: its default setting's monthly median, its 2027 median and mean, the EIA's path on the futures basis from the edition it reads and its calibrated demand response, dated 17 Nov 2026
Copied from the Brent price simulation with its date
- computed hereThe reserve drawdown simulation on this site: the US reserve's deliveries still due, the barrels it is owed with their premium, the first-return window, the fill range and the return schedules, dated 17 Nov 2026
Copied from the reserve drawdown simulation with its date
- publicOPEC: the seven countries' meeting of 4 October 2026, November 2026 required production
Source: OPEC · https://opec.org/pr-detail/1891616-4-october-2026.html
- computed hereFigures quoted from agencies, analysts and the press (IEA, S&P Global, Energy Aspects, Kpler, Goldman Sachs, the Department of Energy, insurers), each with its document, section and date in the inputs table
Quoted as published; each input names its document and date
- computed hereSettings from the research notes of 18 Oct and 1 Nov 2026 (elasticities, the producers' rules, the restocking timetables, the shipping wedge), each named as a setting in the inputs table
Settings of the model, named as such
- computed hereThe model: one path for each of 864 settings, the premium, its half-life and the producers' response fitted to the futures closes, computed here
Model-conditional paths computed by the site's engine; not forecasts.
Pages this one copies from
| Page | Title | Updated | Data to | Arrays | Values | Source checks |
|---|---|---|---|---|---|---|
| Brent price simulation | Brent price simulation | 2026-11-17 | 13 Nov 2026 | 2 | 18 | 107 pass |
| Reserve drawdown simulation | Reserve drawdown simulation | 2026-11-17 | 6 Nov 2026 | 0 | 30 | 83 pass |
Reproduction checks
| Check | Published | Computed | Tolerance | Result |
|---|---|---|---|---|
| Context contracts (OB6): 4 of 4 requested on this day's fetch and on disk (BZH28.NYM, BZM28.NYM, BZM29.NYM, BZZ30.NYM); 0 not requested that day (requested and missing) | 0 | 0 | 0 | pass |
| Curve: every contract from BZF27.NYM to BZZ29.NYM has its last completed session on 13 Nov 2026, the front month's (contracts on another date) | 0 | 0 | 0 | pass |
| Curve: a month whose contract has stopped trading by 13 Nov 2026 is a realised actual outside the fit — the front month's average over a complete month of at least 15 sessions — and the fit reads the 19 quoted contracts only (0 realised; months otherwise) | 0 | 0 | 0 | pass |
| Curve: the BZF27.NYM contract prices Nov 2026, two months before its delivery month (the front-month basis) | 2026-11 | 2026-11 | 0 | pass |
| Curve: the quoted months are distinct and run forward | 19 | 19 | 0 | pass |
| Curve: the contracts quote every month from November 2026 to December 2027 | 14 | 14 | 0 | pass |
| Curve: the reference path equals every quoted close at its month (max abs difference, $) | 0 | 0 | 0 | pass |
| Curve: the long-run level's contract, BZZ30.NYM, has its last completed session on 13 Nov 2026, the front month's, as the quoted contracts do (the date of its last close) | 2026-11-13 | 2026-11-13 | 0 | pass |
| Curve: the long-run level is the furthest contract fetched, BZZ30.NYM | BZZ30.NYM | BZZ30.NYM | 0 | pass |
| History: twelve monthly averages of the front month, Nov 2025 to Oct 2026, each from at least 15 sessions (months short) | 0 | 0 | 0 | pass |
| Curve: the 2027 average is the mean of the twelve quoted closes, March 2027 to February 2028 contracts (abs difference) | 83.747499 | 83.747499 | 0 | pass |
| Copies: the drawdown simulation repays the reserve on a one-year and a two-year schedule, as this page's settings read them (weeks) | 52104 | 52104 | 0 | pass |
| US: the expected owed pool is (lent + the October exchange + the September award + the 16 October offer at the mean uptake) × (1 + the mean premium) = 203.335 mb, as the draws average it (abs difference) | 203.33458 | 203.33458 | 0 | pass |
| US: every schedule delivers the same barrels still due; only the returns differ (max abs difference, mb a week) | 0 | 0 | 0 | pass |
| US: the “As fast as the sites allow” schedule's months carry its weekly returns, none before Nov 2026 (barrels before, mb) | 0 | 0 | 0 | pass |
| US: the “As fast as the sites allow” schedule's returns all fall by Dec 2029 (barrels after, mb) | 0 | 0 | 0.5 | pass |
| US: the “Over one year” schedule's months carry its weekly returns, none before Nov 2026 (barrels before, mb) | 0 | 0 | 0 | pass |
| US: the “Over one year” schedule's returns all fall by Dec 2029 (barrels after, mb) | 0 | 0 | 0.5 | pass |
| US: the “Over two years” schedule's months carry its weekly returns, none before Nov 2026 (barrels before, mb) | 0 | 0 | 0 | pass |
| US: the “Over two years” schedule's returns all fall by Dec 2029 (barrels after, mb) | 0 | 0 | 0.5 | pass |
| US: the “Deferred six months” schedule's months carry its weekly returns, none before Nov 2026 (barrels before, mb) | 0 | 0 | 0 | pass |
| US: the “As fast as the sites allow” schedule returns the expected owed pool, 203.3 mb, by December 2029 (mb returned) | 203.33458 | 203.33458 | 0.5 | pass |
| US: the “Over one year” schedule returns the expected owed pool, 203.3 mb, by December 2029 (mb returned) | 203.33458 | 203.33458 | 0.5 | pass |
| US: the “Over two years” schedule returns the expected owed pool, 203.3 mb, by December 2029 (mb returned) | 203.33458 | 203.33458 | 0.5 | pass |
| US: deferred six months, 203.2 of the 203.3 mb are back by December 2029, the rest after | 1 | 1 | 0 | pass |
| US: no schedule's month returns more than the sites' combined top fill rate, 0.672 mb a calendar day (largest month, mb a day) | 1 | 1 | 0 | pass |
| US: every schedule's average flows equal the drawdown engine's mean of 20,000 paths on the same weeks, week by week to 4 Jan 2030, within 4 standard errors (largest gap, standard errors) | 0 | 2.659545 | 4 | pass |
| US: the deliveries still due from Nov 2026 are the September award, the 16 October offer at 2026's mean uptake and the next season's weather exchanges, less any part before Nov 2026; the October exchange was delivered in October (mb) | 30.336667 | 30.336667 | 0.5 | pass |
| Copies: the Brent price simulation's calibrated elasticity is its literature centre times its 2026 scale, at each horizon (max abs difference) | 0 | 0 | 0 | pass |
| Demand: the replay setting, −0.0496, read through the engine's own six-month average for a lasting 1% price rise, responds 0.0440 at 12 months, the simulation's calibrated 0.044 (abs difference) | 0.044 | 0.044024 | 0.0005 | pass |
| Targets: Saudi Arabia, Iraq and Kuwait's November required production sums to the model's 17.6 mb/d (abs difference) | 17.6 | 17.585 | 0.05 | pass |
| Stocks: the slope of 0.04 a day of cover matches Goldman's points, ln(56/75) over 800/105 days = −0.0383 (abs difference) | 0.04 | 0.038343 | 0.005 | pass |
| Ledger: other members' share of the collective action is the pledge less the US's (426 − 172.2 mb, printed to the mb) | 254 | 253.8 | 0.5 | pass |
| Ledger: the 96 mb still to deliver are the US's 40 and the others' 56 | 96 | 96 | 0 | pass |
| China: the gap to refill is the 4 May record less the 19 October stocks (1,354 − 1,192 mb) | 162 | 162 | 0 | pass |
| China: the new storage is the state and other capacity (80 + 24 mb) | 104 | 104 | 0 | pass |
| Tension: the engine's relapse runs July to September 2027 and fades at a 6-month half-life, as the spec says | 2027-0736 | 2027-0736 | 0 | pass |
| Ledger: the barrels released are the state and obligated-industry parts (240 + 91 mb) | 331 | 331 | 0 | pass |
| Stocks: one day of cover is the engine's 105 mb | 105 | 105 | 0 | pass |
| Port: the cited baseline consumption path is the prototype's, every month (max abs difference, mb/d) | 0 | 0 | 0 | pass |
| Port: the cited baseline supply outside the Gulf is the prototype's, every month (max abs difference, mb/d) | 0 | 0 | 0 | pass |
| Port: the front month's twelve monthly averages equal the prototype's, typed to the cent (max abs difference, $) | 0 | 0.004501 | 0.005 | pass |
| Port: the 19 Yahoo Finance closes of 30 Oct 2026, the prototype's last session, equal the TradingView settlements the prototype typed (max abs difference, $) | 0 | 0.000004 | 0.005 | pass |
| Port: on the prototype's inputs and fitted parameters, 5 settings reproduce its paths — prices, stocks, Gulf output, China's refills, US returns (max abs difference) | 0 | 0 | 0.000001 | pass |
| Port: refitted to the prototype's curve, the default's premium, half-life and response match its fit (32.66, 11.48, 0.113; max abs difference) | 0 | 0 | 0.0001 | pass |
| Copies: every month the Brent price simulation publishes (Dec 2026–Dec 2027) is a month of this page's horizon, and each copy is matched to its month, not its place (months off the horizon) | 0 | 0 | 0 | pass |
| Copies: the Brent price simulation's futures equal this page's quoted closes in the 13 months both price (13 Nov 2026; max abs difference) | 0 | 0 | 0.0005 | pass |
| Copies: the Brent price simulation's 2027 futures strip equals this page's 2027 average of the same closes (13 Nov 2026; abs difference) | 83.747 | 83.747499 | 0.0005 | pass |
| Fit: the default's average miss against the 19 quoted contracts is under 3% (0.92%) | 1 | 1 | 0 | pass |
| Run: every setting of the grid has a path (864 = 6 schedules × 3 rules × 4 de-escalations × 3 demand responses × 4 restocking settings) | 864 | 864 | 0 | pass |
| Run: commercial stocks follow the flows, every month of all 864 settings: ΔX = 30.4 × (supply − demand − refills + releases) − Δstorage (max abs residual, mb) | 0 | 0 | 0.000001 | pass |
| Run: price = stock-driven price + premium, every month of all 864 settings (max abs difference, $) | 0 | 0 | 0.000001 | pass |
| Run: the premium = geopolitical premium × tension + the shipping cost passed into Brent, all 864 settings (max abs difference, $) | 0 | 0 | 0.000001 | pass |
| Run: the storage solve meets its stopping rule in every setting, 1 of them with the step halved after 400 rounds (fast|hold|slow|base|fast) (settings that do not) | 0 | 0 | 0 | pass |
| Run: where storage fills, no month-to-month spread sits above full carry (max abs excess, $) | 0 | 0.014505 | 0.05 | pass |
| Run: UAE output depends on de-escalation and demand only, the same in every cell of a block (max abs difference, mb/d) | 0 | 0 | 0 | pass |
| Run: the default setting's yearly averages equal a fresh run of it (max abs difference, $) | 0 | 0.003384 | 0.005 | pass |
| Run: the sensitivity's base is the default setting (abs difference, 2028, $) | 75.66 | 75.656616 | 0.005 | pass |
| Ledger: releases still due are other members' 56 mb and the US's 30.3 mb on the drawdown simulation's inputs (mb) | 86.336667 | 86.336667 | 0.5 | pass |
| US: the “No returns” schedule as run returns 0.0 mb by December 2029 (mb returned) | 0 | 0 | 0.5 | pass |
| US: the “No returns” schedule's largest month is within the sites' top fill rate, 0.672 mb a calendar day | 1 | 1 | 0 | pass |
| US: the “As fast as the sites allow” schedule as run returns 203.3 mb by December 2029 (mb returned) | 203.33458 | 203.33458 | 0.5 | pass |
| US: the “As fast as the sites allow” schedule's largest month is within the sites' top fill rate, 0.672 mb a calendar day | 1 | 1 | 0 | pass |
| US: the “Over one year” schedule as run returns 203.3 mb by December 2029 (mb returned) | 203.33458 | 203.33458 | 0.5 | pass |
| US: the “Over one year” schedule's largest month is within the sites' top fill rate, 0.672 mb a calendar day | 1 | 1 | 0 | pass |
| US: the “Over two years” schedule as run returns 203.3 mb by December 2029 (mb returned) | 203.33458 | 203.33458 | 0.5 | pass |
| US: the “Over two years” schedule's largest month is within the sites' top fill rate, 0.672 mb a calendar day | 1 | 1 | 0 | pass |
| US: the “Deferred six months” schedule as run returns 203.2 mb by December 2029 (mb returned) | 203.239488 | 203.239488 | 0.5 | pass |
| US: the “Deferred six months” schedule's largest month is within the sites' top fill rate, 0.672 mb a calendar day | 1 | 1 | 0 | pass |
| US: the “Cheapest months” schedule as run returns 203.3 mb by December 2029 (mb returned) | 203.33458 | 203.33458 | 0.5 | pass |
| US: the “Cheapest months” schedule's largest month is within the sites' top fill rate, 0.672 mb a calendar day | 1 | 1 | 0 | pass |
| US: the cheapest-months schedule buys only from Jan 2027 to Jun 2029 (barrels outside, mb) | 0 | 0.000002 | 0.5 | pass |
| Restocking us_only: other members refill at most their 254 mb, China at most its 162 mb and 104 mb of new storage | 1 | 1 | 0 | pass |
| Restocking us_only: China's multiplier stays between 0 and 1.5 | 1 | 1 | 0 | pass |
| Restocking slow: other members refill at most their 254 mb, China at most its 162 mb and 104 mb of new storage | 1 | 1 | 0 | pass |
| Restocking slow: China's multiplier stays between 0 and 1.5 | 1 | 1 | 0 | pass |
| Restocking base: other members refill at most their 254 mb, China at most its 162 mb and 104 mb of new storage | 1 | 1 | 0 | pass |
| Restocking base: China's multiplier stays between 0 and 1.5 | 1 | 1 | 0 | pass |
| Restocking fast: other members refill at most their 254 mb, China at most its 162 mb and 104 mb of new storage | 1 | 1 | 0 | pass |
| Restocking fast: China's multiplier stays between 0 and 1.5 | 1 | 1 | 0 | pass |
| China: no buying in November 2026, October's Brent ($108.34) sitting above its 12-month average ($86.12) by more than $20 | 1 | 1 | 0 | pass |
| Order: producing at targets gives lower 2028 Brent than trimming as stocks rise | 1 | 1 | 0 | pass |
| Order: producing to capacity gives lower 2028 Brent than trimming as stocks rise | 1 | 1 | 0 | pass |
| Order: while producers trim, Gulf core output takes part of the restocking (2028 output higher with the base restocking than with none) | 1 | 1 | 0 | pass |
| Grammar: the headline, every tile, takeaway and falsifier row keep the house grammar (faults) | 0 | 0 | 0 | pass |
| Grammar: every reader line reads in one pass — subject first, one qualifier, no method word, no sentence over 28 words (59 strings; faults) | 0 | 0 | 0 | pass |
| Copies: every value copied from the two simulations is published as a dated record the serve-time check reads (45 values beside the 29 monthly ones and averages; missing) | 74 | 74 | 0 | pass |
| The Reserve drawdown simulation page: the source page is published with all its checks passing (dated 17 Nov 2026, 83 checks) | 1 | 1 | 0 | pass |
| The Reserve drawdown simulation page: the site still serves the page this one copied (dated 17 Nov 2026) | 1 | 1 | 0 | pass |
| The Brent price simulation page: the source page is published with all its checks passing (dated 17 Nov 2026, 107 checks) | 1 | 1 | 0 | pass |
| The Brent price simulation page: the site still serves the page this one copied (dated 17 Nov 2026) | 1 | 1 | 0 | pass |
| The Brent price simulation page: every copied observation equals the source page, matched by date (26 values in 2 arrays; mismatches) | 0 | 0 | 0 | pass |
| The Reserve drawdown simulation page: every copied single value equals the source page (30 values; mismatches) | 0 | 0 | 0 | pass |
| The Brent price simulation page: every copied single value equals the source page (18 values; mismatches) | 0 | 0 | 0 | pass |
| Decisions: every desk decision this page's specification names is in the decisions file (D-2026-11-05-OB1, D-2026-11-05-OB2, D-2026-11-05-OB3, D-2026-11-05-OB4, D-2026-11-05-OB5, D-2026-11-05-OB6, D-2026-11-05-OB7, D-2026-11-05-OB8, D-2026-11-05-OB9; ids missing) | 0 | 0 | 0 | pass |
- Yahoo Finance: Brent crude futures (BZ=F) daily closes and the delivery-month contracts January 2027 to February 2028, December 2028 and December 2029, completed sessions to 13 Nov 2026 — Source: Yahoo Finance
- The Brent price simulation on this site: its default setting's monthly median, its 2027 median and mean, the EIA's path on the futures basis from the edition it reads and its calibrated demand response, dated 17 Nov 2026 — Copied from the Brent price simulation with its date
- The reserve drawdown simulation on this site: the US reserve's deliveries still due, the barrels it is owed with their premium, the first-return window, the fill range and the return schedules, dated 17 Nov 2026 — Copied from the reserve drawdown simulation with its date
- OPEC: the seven countries' meeting of 4 October 2026, November 2026 required production — Source: OPEC
- Figures quoted from agencies, analysts and the press (IEA, S&P Global, Energy Aspects, Kpler, Goldman Sachs, the Department of Energy, insurers), each with its document, section and date in the inputs table — Quoted as published; each input names its document and date
- Settings from the research notes of 18 Oct and 1 Nov 2026 (elasticities, the producers' rules, the restocking timetables, the shipping wedge), each named as a setting in the inputs table — Settings of the model, named as such
- The model: one path for each of 864 settings, the premium, its half-life and the producers' response fitted to the futures closes, computed here — Model-conditional paths computed by the site's engine; not forecasts.